Rig-site & industrial site development
Land development, clearing, grading, levelling, soil stabilisation, sand filling, compaction and platform construction.
Land development, clearing, grading, levelling, soil stabilisation, sand filling, compaction and platform construction. Includes cellar points, rig leg, generator and mud tank foundations, mud pit excavation and BOP stack foundations, with compaction testing at defined intervals.
Key capabilities
- Clearing, grading and levelling
- Sand filling and compaction
- Cellar point and rig leg foundations
- Generator and mud tank foundations
- Mud pit excavation
- BOP stack foundations

Track record
Where we've done this
OngoingFAR Industrial Park
An ongoing FAR Group development designed as an integrated industrial and logistics hub, 30 km from Dhaka.
Ghorashal, NarsingdiIndustrial2027 (exp.)
OngoingDupitila-01 (DP-1)
Land development and road infrastructure delivered entirely through our own resources and execution team. Road construction is now nearly complete.
SylhetOil & gas rig site2027 (exp.)
OngoingBakhrabad-11
Deep well rig-site development with higher load allowances: enhanced subgrade and pad layering under strict compaction verification, strengthened haul routes, and drainage and flood management.
ComillaOil & gas rig site2026 (exp.)
CompletedKamta-02
Access roads, site preparation and the full rig foundation package for a deep well, including cellar point, rig leg, mud pit and BOP stack. Now complete.
GazipurOil & gas rig site2026
CompletedTitas-31
Land development, platform and foundations with roads, culverts and HBB works. Compaction testing at 100-ft intervals. Now complete.
Titas, BrahmanbariaOil & gas rig site2026
CompletedTitas-28 / 29 / 30
Three independent wellhead foundation systems on one shared footprint, with access roads, drainage, HBB roads and rig-site foundations. Handed over before the due date.
Titas, BrahmanbariaOil & gas rig site2025
CompletedRashidpur-11 (RP-11)
A full end-to-end civil package on a remote site that needed significant topographic modification to produce a stable construction platform.
Rashidpur, SylhetOil & gas rig site2025
CompletedSylhet-10X
Our first field delivery: supporting civil infrastructure for the generator, mud pump and circulating systems, with foundations engineered for high-pressure conditions.
SylhetOil & gas rig site2025
- Upcoming
Srikail Deep-1
A high-stability deep well rig site with an engineered pad, all-weather access, dedicated crane and heavy-equipment zones, and full HSE and environmental controls, handed over drill-ready with QA/QC and as-built records.
ComillaOil & gas rig site
- Upcoming
Mubarakpur Deep-1
A high-stability deep well rig site with an engineered pad, all-weather access, dedicated crane and heavy-equipment zones, and full HSE and environmental controls, handed over drill-ready with QA/QC and as-built records.
PabnaOil & gas rig site
- Upcoming
Kailashtila-09
Rig-site land development and road infrastructure: land filling and compaction to form a stable construction platform, with access roads to the site, delivered with our own equipment and execution team.
SylhetOil & gas rig site